JumpGate

Independent Time-to-Power ratings for ERCOT generation interconnection

We estimate a P50/P80 energization window and flag the upgrade risks most likely to move your in-service date.

Independent estimate. Not a guarantee or utility commitment.

Time-to-Power (TTP) Score

Identify high-probability sites and flag 'Zombie' projects before they strand capital.

Energization Window

P50/P80 COD range based on queue + upgrades + constraints.

Upgrade Risk Flags

Substation and transmission triggers, cost and lead-time drivers, what delays energization.

Interconnection Point Alternatives

Nearby substations or pivots that avoid the worst upgrade paths.

What You Get

For BESS, solar, and wind developers evaluating interconnection points in ERCOT.

  1. TTP Score (1–100) and top drivers

  2. P50/P80 energization window with assumptions

  3. Upgrade risk flags (cost, scope, lead-time drivers)

  4. Upgrade competition map (projects competing for the same upgrades)

  5. Action plan (kill/proceed, pivot options, what to request/verify)

How it works

  1. Send substation / interconnection point, MW, tech, target in-service date (COD)

  2. We analyze queue, constraints, likely upgrade paths

  3. You get a score + P50/P80 window + risk flags (PDF)

In 1909, Moody’s priced the railroads. Today, we price the grid.

JumpGate is a Safebuk, Inc. company
All rights reserved
San Francisco, California