JumpGate
Independent Time-to-Power ratings for ERCOT generation interconnection
We estimate a P50/P80 energization window and flag the upgrade risks most likely to move your in-service date.
Independent estimate. Not a guarantee or utility commitment.
Time-to-Power (TTP) Score
Identify high-probability sites and flag 'Zombie' projects before they strand capital.
Energization Window
P50/P80 COD range based on queue + upgrades + constraints.
Upgrade Risk Flags
Substation and transmission triggers, cost and lead-time drivers, what delays energization.
Interconnection Point Alternatives
Nearby substations or pivots that avoid the worst upgrade paths.
What You Get
For BESS, solar, and wind developers evaluating interconnection points in ERCOT.
TTP Score (1–100) and top drivers
P50/P80 energization window with assumptions
Upgrade risk flags (cost, scope, lead-time drivers)
Upgrade competition map (projects competing for the same upgrades)
Action plan (kill/proceed, pivot options, what to request/verify)
How it works
Send substation / interconnection point, MW, tech, target in-service date (COD)
We analyze queue, constraints, likely upgrade paths
You get a score + P50/P80 window + risk flags (PDF)